|
2/24/25
|
Work has been completed on the Irvine High School Performing Arts Center, a cutting-edge facility designed to inspire creativity and support the performing arts. The $35 mil, 25k sf, single-story complex opened its doors to the community during a grand opening celebration on February 7, 2025.
Built by C.W. Driver Companies, the state-of-the-art venue features a 650-seat main theater equipped with advanced sound, lighting, and rigging systems, providing students and the community with a professional-grade performance experience. Additional spaces include a Black Box theater, Scene Shop, Dressing Rooms, and a modern lobby, ensuring the facility supports a wide range of performances, rehearsals, and events. The steel and metal frame diaphragm building features a combination of metal panels, plaster, and curtain wall system finishes.
The ground-up construction, which began in January 2023 and was completed in early 2025, showcases C.W. Driver Companies’ expertise in delivering innovative and sustainable construction projects. From the initial demolition and site preparation to the final finishes, the team prioritized quality and functionality, creating a space that elevates the arts and provides long-term value to the community. Additional services in the first phase included site utility relocations, grading, and deep soil mixing columns/ground improvements. Phase two consisted of building construction, site paving, concrete flatwork, utility systems, and landscape planting/irrigation.
|
|
Return to the previous page
|
|
|
|
|