The Small Space Marketplace

List Your Space

Find Space

Home About Us Executive Subscriber Membership RENTV Conferences Newsletter Contact Us Advertise
March 29, 2024
 Search RENTV
   Go!
 The REview
 News
News Home Page
Southern California
Northern California
Pacific Northwest
Texas/Southwest
Retail
Multifamily
Financing
Prop. Management
Archives
Press Releases
 R. E. Marketplace
Service Providers
JobWorks
Property Spotlight
 RENTV  Conferences
Subscriber Login:
  
Email      
    Go!
Password      
Forgot Password?



ETC... ETC...
Printer-friendly Version   Email an Associate
Build-Out of 160k sf Space for Georgia-Pacific LLC Completed at Phoenix Logistics Center

3/27/23

Phoenix-based Stevens-Leinweber Construction (SLC) has completed the custom build-out of 160k sf at Phoenix Logistics Center (PLC) Two, a 481.6k sf facility designed to meet the manufacturing and distribution needs of new tenant Georgia-Pacific LLC and its HP PageWide T1190 Press, the world’s largest high-volume digital pre-print solution for corrugated packing.

The new press was purchased to expand the Hummingbird® digital print solutions offered by Georgia-Pacific (GP), one of the nation’s leading packaging providers. The equipment makes GP the only packaging supplier in North America to currently offer 110-inch wide web digital inkjet printing, which gives its customers unmatched flexibility for high graphic packaging.

PLC Two is the second building within Merit Partners’ Phoenix Logistics Center, a state-of-the-art warehouse, distribution and manufacturing campus located at the southeast corner of 91st Avenue and Buckeye Rd in Phoenix, within the I-10 Corridor.

To support the T1190, SLC constructed a specialized foundation requiring 163 piers, each drilled 15 feet deep, to help support an 18” thick mat concrete foundation with heavy rebar reinforcement. The construction team also brought in 7200 amps of dedicated power specifically for the Georgia-Pacific tenant improvement, as well as temporary power to allow Georgia-Pacific to test its equipment while waiting for long-lead-time electrical gear. A heavy-duty HVAC package was installed during the build-out to help manage the higher level of heat and air pressure generated from the printer.

The T1190 printer is part of a larger Georgia-Pacific operation at PLC Two that includes a 40k sf printing production space, 110k sf of specialized storage space and 10k sf of interior office, breakroom and conference areas.

SLC completed the shell building and tenant improvement for Georgia-Pacific. Ware Malcomb was the building’s project architect. Anthony Lydon, Marc Hertzberg, Riley Gilbert and John Lydon of JLL are the building’s exclusive leasing brokers.

Built originally on a speculative basis, PLC Two offers 40’ clear height, 70’ speed bays, a 190’ truck court, generous parking, 160 dock-high doors and six grade-level doors. It is leased to Georgia-Pacific and Owens Corning, which occupies the building’s remaining space.

PLC Two is located less than three miles from a full-diamond I-10 interchange and less than 30 minutes from Sky Harbor International Airport. For last-mile distributors, the project is also within a 30-minute drive to more than 1.9 million residents and 674,052 households.

PLC Two sits adjacent to PLC One, a fully leased, 268.9k sf industrial building.






Return to the Archive page


 
 


 
 
 



Home | About Us | Newsletter | Contact Us | Executive Subscriber Membership | Executive Subscriber Home | Advertise
Southern California | Northern California | Pacific Northwest | Southwest | Retail | Multifamily | Financing | Property Management
Archives | Press Releases | Service Providers | JobWorks | Property Listings

Copyright © 2024 by RENTV, All Rights Reserved
Website designed by Regency Web Services, Inc. and powered by Lightning Media